Goals and Projects for 2019.

Goals and Projects
        During the year 2019
Project Not started Working on Completed
1 Replace the Main Entrance sign at Rt. 124 X
2 Cut out and replace rotted steel on Bandstand X
3 Mount Jungle panels on Ammo Cage # 77 X
4 Clean the inside of the North Barn X
5 Sandblast and paint RBBB Bandstand X
6 Repair and replace some windows in barns X
7 Replace the Roof on the North Barn X
8 Scrape and Paint the ends of Barns X
9 Cut the tree out of the long cage in back X
10 Update Website X
11 Repaint Concession stand for Downtown X
12 Change Displays inside North Barn X
13 Repaint the RBBB Clown Panel at the Front Office X
14 Replace signs in Hall of Fame Greats X
15 Install new audio signs in display areas X
16 Newsletter Created and Distributed X
17 Repair Knott’s Berry Farm wagon in Shop X
18 Replace Glass window in Cabinet in North Barn X
19 Begin the restoration of the Old Office Building X
20
21
22

 

 

               Goals and Projects
                       During the year 2018
Project Not started Working on Completed
1 Put new Building Location signs in place X
2 Remove Steel arena from Display X
3 Attend 100th Anniversary of Showman’s Rest X
4 Clean the Tom Dunwoody model from the inside X
5 New tires & Bearings installed on RBBB Bandstand X
6 Repairthree wheels on the Robbins Bros. Baggage Wagon X
7 Replace the Cage # 50 undergear with Spring gear X
8 New material on Betty Hutton Float is hemmed X
9 Cut the tree out of the long cage in back X
10 Update Website X
11 Repaint Concession stand for Downtown X
12 Repaint the Sign turning in from Rt. 124 X
13 Repaint the RBBB Clown Panel at the Front Office X
14 Repaint the Mack Truck cab X
15 Repair Mack Truck engine X
16 Paint bottom ammo cage panel X
17 CMB wagon moved out front X
18 Sig Sautelle has gold leaf added X
19 Henry Keys Music collection is sorted out X
20 CHOF Concession stand in place for summer use X
21
22

This function has been disabled for International Circus Hall of Fame.